Bathroom Remodel Feb2024

Solo Bathroom Remodel in a Week

Remodeling a bathroom can be a challenging yet rewarding project, especially if you plan to do it solo!

Day 1: Planning and Preparation

  • Assess the Current Bathroom: Take measurements and note the layout.

  • Set a Budget: Determine how much you are willing to spend.

  • Gather Supplies: Create a list of materials needed (tiles, fixtures, paint, etc.).

  • Design: Sketch out your new bathroom layout and design.

Day 2: Demolition

  • Remove Fixtures: Take out the toilet, sink, and any other fixtures.

  • Take Down Tiles: Carefully remove old tiles from walls and floors.

  • Dispose of Debris: Ensure proper disposal of old materials.

Day 3: Plumbing and Electrical Work

  • Check Plumbing: Inspect and repair any plumbing issues.

  • Update Electrical: Ensure outlets and lighting are up to code.

  • Install New Fixtures: Set up new plumbing fixtures if applicable.

Day 4: Flooring Installation

  • Prepare Subfloor: Ensure it’s clean and level.

  • Install New Flooring: Lay down tiles, vinyl, or any chosen flooring material.

  • Allow to Set: Follow manufacturer instructions for curing time.

Day 5: Wall Treatments

  • Install Mold-Free: Hung to manufactures spec

  • Second Coat: Applied a seal and finishing coat.

  • Sand Mud: Wet Sponged the entire room.

Day 6: Installing Fixtures

  • Install Vanity and Sink: Securely place and connect plumbing.

  • Install Toilet: Follow instructions for proper installation.

  • Attach Lighting: Install light fixtures and ensure they are functional.

  • Add Accessories: Hang mirrors, towel bars, and other accessories.

  • Clean Up: Remove any debris and clean the space thoroughly.